Requirement study for the business integration of the new SCADA/EMS system on the AES SONEL network in Cameroon

( Télécharger le fichier original )
par Mbelli Njah Fongha
Polytechnic,Yaounde - Masters Engineering in Electrical Engineering(Diplome d'ingenieur de conception avec option Genie Electrique) 2009
  

précédent sommaire

Bitcoin is a swarm of cyber hornets serving the goddess of wisdom, feeding on the fire of truth, exponentially growing ever smarter, faster, and stronger behind a wall of encrypted energy

3.3.1: Telecommunication systems quality assurance conformance checklist

System

Exist

Non-existent

Functional

Non-functional

Fiber optic systems

 
 
 

PLC systems

 
 
 

Radio systems

 
 
 

Telephone systems

 
 
 

Data links

 
 
 

Satellite system

 
 
 

Microwave systems

 
 
 

Voice recorders at system control centers

 
 
 

GSM and GPRS systems

 
 
 

3.3.2: Systems rollout quality assurance conformance checklist

Item

Established

Non-established

Migration conditions

 
 

Migration strategy

 
 

- Advantages

 
 

- Disadvantages

 
 

Plan

 
 

3.3.3: Training quality assurance conformance checklist

Item/Issue

Established/exist

Non-established/non-existent

Criteria for selection of trainees

 
 

List of trainees selected

 
 

Reason for training

 
 

Training plan

 
 

Training program

 
 

Training manuals

 
 

Training facilities and equipments

 
 

Scope and target group for training

 
 

3.3.4: Documentation quality assurance conformance checklist

Item/Issue

Established/exist

Non-established/non-existent

System level documentation

 
 

Operating instructions

 
 

Dispatcher's manual

 
 

Overview to operations

 
 

User's handbook

 
 

System operator's handbook

 
 

Database, display, and report generation and maintenance manuals

 
 

System design hardware documents

 
 

Detailed hardware documents

 
 

Assembly drawings and instructions

 
 

Preventive maintenance instructions

 
 

Corrective maintenance instructions

 
 

System design software documents

 
 

Detailed software documents

 
 

Software manuals

 
 

System functional descriptions

 
 

CONCLUSION AND PERSPECTIVES

The complete transfer and the full ownership of this new technology by AESS which has as consequences the successful implementation of the new electricity market system in Cameroon; successful modernization/improvement of network operations management at AESS; the sustainability of the system as well as its correct implementation by the EPC contractor (Siemens), all depend on a successful business integration.

Most of the aspects and requirements for a successful business integration of this new system have been cited as well as their corresponding specifications and benefits in terms of quality assurance measures for proper business integration, which was the aim of this master thesis work.

The scope of this master thesis work being limited to the SCADA/EMS system on the southern grid, future work would entail a requirement study for business integration for the SCADA/EMS system on the northern grid and for the other PMS systems (SCADA/WRMS and SCADA/AMR/MMS) on the southern grid and the northern grid.

Given the fact that AESS is already at the statement of work phase in the implementation of the system, the next steps of this master thesis work in the implementation of the project include

Ø Business integration plan

Ø Equipment installation

Ø Quality data supply for the system

Ø Change management plan

Ø Technology transfer strategy

A Perspective in research of this work is the establishment of a model for the development of specifications for the design of quality assurance softwares in installing and integrating information systems.

BIBLIOGRAPHY/REFERENCES

[1] FICHTNER, AES-SONEL System Control Center and Metering System Cameroon Documents, 2006

[2] Alain Oyono, SCADA/Power Management System Project opening memo, 2007

[3] Hans Francis Simb Nag, Alain Oyono and Vincent Mainsah, TSO unbundling memo documents, 2008

[4] Hans Francis Simb Nag, Alain Oyono and Vincent Mainsah, TSO documents of the new electricity market structure in Cameroon, 2008

[5] Areva T & D, Areva T & D Bidpackage for the AES-SONEL National System Control Center and Metering System Project

[6] Siemens, Siemens Bidpackage for the AES-SONEL National System Control Center and Metering System Project

.

[7] Larry Whitman, Business Process Re-engineering; A consolidated Methodology

[8] NYISO (New York Independent System operator) Webpage, www.NYISO.com.

[9] National Grid Webpage, www.nationalgrid.com/www.nationalgrid.co.uk.

[10] www.wikipedia.com /requirement engineering

[11] Crnkovic I, Asklund U & persson Dahlqvist, Implementing and Integrating product data

[12] Dennis A, Wixon B.H and Tegarden D, system analysis and design: An object-oriented approach with UML, New York: John Willey and Sons, Inc

[13] Huang G.H & Mk K.L, current practices of engineering change management in UK manufacturing industries, International Journal of operations and production management

[14] United states defense acquisition press, systems engineering fundamentals, 2001

[15] Beth Gold-Bernstein, Defining business integration requirements, 09/16/2003

[16] United states general accounting office, Business process reengineering assessment guide, May 1997

[17] Thomas Davenport, Reengineering-The fad that forgot people, November 1995

[18] Furey Timothy R, a six step guide to process reengineering, 1993

[19] Harrison Brian D, Pratt Maurice D, methodology for reengineering business, 1993

[20] Mangelli Raymond L & Klein Mark M, The Reengineering handbook: A step-by-step guide to business transformation, business management association, new York

[21] Mayer Richard J & Dewitte Paula S, Delivery results: evolving BPR from art to engineering

[22] Underdown D.R, Transform enterprise methodology, 1997

[23] Hans Francis Simb Nag, Memo on the establishment of a subsidiary

[24] William S. Davis and Dr. David C. Yen, The information system consultant's handbook: system analysis and design.

[25] Dan Alexandre Seni, Vice President of SETYM technologies of Montreal, HARD AND SOFT: AN EMPIRICAL FRAMEWORK FOR THE MANAGEMENT OF TECHNOLOGY TRANSFER PROJECTS

[26]Immanuel Fon Umenei, MatLab-based design of controllers for the Cameroon Power network (The Southern grid), End of course dissertation, July 2008

[27] United states defense acquisition press, systems engineering fundamentals, 2001

ANNEX

Figure 17: Generation assets and storage dams foe AES Sonel

Figure 18: National System Control Center (NSCC), Douala

Figure 19: North Control Center, Garoua

Figure 20: Yaoundé Control Center, Yaoundé

précédent sommaire






Bitcoin is a swarm of cyber hornets serving the goddess of wisdom, feeding on the fire of truth, exponentially growing ever smarter, faster, and stronger behind a wall of encrypted energy








"Des chercheurs qui cherchent on en trouve, des chercheurs qui trouvent, on en cherche !"   Charles de Gaulle