WOW !! MUCH LOVE ! SO WORLD PEACE !
Fond bitcoin pour l'amélioration du site: 1memzGeKS7CB3ECNkzSn2qHwxU6NZoJ8o
  Dogecoin (tips/pourboires): DCLoo9Dd4qECqpMLurdgGnaoqbftj16Nvp


Home | Publier un mémoire | Une page au hasard

 > 

Etude de méthodes d'analyse des historiques de maintenance dans un environnement de forage pétrolier offshore

( Télécharger le fichier original )
par Philippe JUNG
CNAM - Ingénieur 2004
  

précédent sommaire suivant

Bitcoin is a swarm of cyber hornets serving the goddess of wisdom, feeding on the fire of truth, exponentially growing ever smarter, faster, and stronger behind a wall of encrypted energy

5. Analyse de l'existant.

Ordering parts

MATERIAL REQUISITIONS (MR)

INVENTORY CONTROL

- Obtain current balance. - Update current balance. - Check location of parts. - Update cost of a part.

- Spare part consumption. - Adjust balance.

- Shares part # w/JDE. - Reports.

Inventory created must be linked to an equipment

Organisation générale de l'application Maximo:

L'application Maximo est découpée en différents modules décrits dans le schéma suivant (Fig.3). Seule la partie "Preventive Maintenance System" (PMS) fera partie de cette étude même si par la suite, les autres modules pourront en être influencés indirectement. Dans la partie PMS, les trois modules qui nous concernent et les liens qui les unissent sont décrits par la suite en ne détaillant que les parties qui apparaissent dans un premier temps nécessaires à l'étude.

Vu la complexité de chaque module et des liens entre eux, certains points seront approfondis au fur et à mesure des étapes du prototypage et aux différentes périodes de la conception.

De même, on ne s'attardera pas à faire le reverse engineering sur la base de donnée dans la mesure ou celle-ci prés existe. On ne donnera que les détails pragmatiques nécessaires à la conception et le plus directement possible à la création du prototype.

Les écrans de Maximo sont paramétrables et adaptés à notre application. Dans ce qui suit, les copies d'écrans sont celles de ceux utilisés actuellement et non les écrans d'origine de l'application.

PREVENTIVE MAINTENANCE SYSTEM (PMS) INVENTORY CONTROL

WORK ORDER (WO) TRACKING

- Insert create a WO.

- Record maintenance comments.

- Record WO status.

- Record spare parts used.

- Record EOT Y/N.

- Record equipment UP/Down.

- Record downtime.

- Research history (filter).

-Reports.

Equipment must be up before closing a WO.

Type of WO

- PM: Preventive Maintenance (created by Maximo).

- CM: Corrective Maintenance.
(created by user)

-RKS: Remarks.

- ALT: Alert.

- SM: Safety Maintenance.

- RM: Routine Maintenance.

- RPT: RMS GOM report only.

WO status

- APPR: Approved.

- WMATL: Waiting for material.

- WOPCOND: Waiting for operating conditions.

- COMP: Completed.

- CLOSE: Closed.

- WAPPR: Waiting for Approval.

- WSCH: Waiting for Schedule.

- INPRG: In Progress.

- Insert (create) a MR.

- Update a MR. - JDE interface.

- Print document for base.

- Create a PO.

- Research history (filter). -Reports.

 
 
 

Companies

 

- Company information. - Report.

 
 

CURRENCY MGMT

- Duplicate JDE PO. - Spare parts receipt.

- Research history (filter). - Reports.

JDE

Receiving parts

PURCHASE ORDER (PO)

MR status
Approved
Unapproved
Cancelled
Closed

- Update currency.

JOB PLANS (JP)

- Maintenance description. - Resources needed.

-Reports.

Contains all Job Plans Modification by HO only

PREVENTIVE MAINTENANCE (PM)

- Generate PM Work Orders on current or selected records.

- Generate WO on a regular basis - Generate for planned or Unplanned shutdowns.

- Stop a PM.

- Modify a PM frequency.

- Preview a PMS.

- Reports.

Frequency modification with manager approval

EQUIPMENT (EQPT)

- Enter meter readings. - Maintenance history.

-Part list for repair.

- Technical data.

- Insert (create) equipment. - Update drilldown.

- Maintenance costs. -Reports.

PO status

ACKLGD: Acknowledged. APPR: Approved. BASE: Received in base. CUSTOM: Under custom. TRANS: Transit. VENDOR: Vendor Dlvy CAN: Cancelled. CLOSE: Closed. PRINT: Printed. SHIPD: Shipped. WAPPR: Waiting

for approval.

PHJ Ing DPE 2004

Figure 3 Organisation générale de Maximo.

précédent sommaire suivant






Bitcoin is a swarm of cyber hornets serving the goddess of wisdom, feeding on the fire of truth, exponentially growing ever smarter, faster, and stronger behind a wall of encrypted energy








"Il existe une chose plus puissante que toutes les armées du monde, c'est une idée dont l'heure est venue"   Victor Hugo